Home > Project Cases > Other Cases

Other Cases

Hotline
+86-371-55902868
Fax
+86-371-55902858
zkeqpt@zkcorp.com

Heze Yuncheng Shengda Ruyi Pulverized Coal Preparation Station

Publication date: 2018-01-19 15:50 article source: ZK Corp viewed:

Project name: 20T Pulverized Coal Preparation Station

Project Location: Shandong, China

Main Equipment: ZKRM08.3 pulverizing coal vertical roller mill


Since 2015, the environmental protection department of Shandong Province has promoted pulverized coal as clean energy to the whole province. Linyi City is a pilot project. Heze Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. approved the 20T pulverized coal boiler project. The pulverized coal boilers and pulverized coal preparation stations begin to bid in China.

 

Henan Zhengzhou Mining Machinery Co., Ltd had rich project experience of pulverized coal preparation station in Shandong province, namely, Linyi Shuangding Decoration Materials Co., Ltd., Linyi Xingyuan Thermal Co., Ltd., Linyi Hongyuan Thermal Co., Ltd. Etc. As the first application of pulverized coal boilers in Heze City, Henan Zhengzhou Mining Machinery Co., Ltd paid great attention on this project.


 Heze-Coal-Vertical-Mill-2.jpg


Our professional team went to the site of Heze Yuncheng Shengda immediately.  Aimed at the specific arrangement of on-site boilers, our technical staff proposed the design. After a week of technical exchanges, the two sides confirmed 6tph vertical mill pulverized preparation station. On June 23, 2016, we signed a business contract. During the execution of the contract, we went to the site for several times to carry out program exchange and project schedule exchange. In October 2016, the ZKRM08.3 pulverizing coal preparation plant was successfully completed and passed the inspection at one time. To provide a good customer service, we not only save the cost of production for customers, but also improve customer productivity.

 

Advantages of Our Pulverized Coal Preparation Station

1.    High grinding efficiency, low power consumption;

2.    Less metal consumption per unit;

3.    Material bed milling, low noise;

4.    Negative pressure operation, less dust pollution;

5.    Simple process, complete the material grinding, drying, selection of powder function at the same time;

6.    Less land area, compact layout, system equipment, light weight, low investment cost in civil construction.

 

Our sales staff stationed at the scene for more than a month, for the on-site operator training and technical delivery, so that our customers can better use the equipment. Currently vertical mill pulverized coal preparation station of Heze Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. has been operated for more than two years. The equipment has a smooth operation, which got a high praise from our customer.

 

 


Last Page:Shandong Dongjia Group Pulverized Coal Preparation Station

Next Page:Yunan Heqing Calcium Aluminate Production Line

Contact Us

Please input your inquiry in below form. We will reply you as soon as possible

+86-371-55902868

+86 13526832749

zkeqpt@zkcorp.com

Qiaoloucaizhai industrial park,XingYang,Zheng
Zhou,Henan,China

“The first-class professional design services High quality products.”

Get Quote

Please fill in your info and we will contact you soon.

  • *Your name:
  • Telephone:
  • *Email:
  • *Message:
WhatsApp
+86 13526832749
WeChat
+86 13526832749