Shandong Heze Yuncheng Shengda Ruyi Printing and Dyeing 50,000t/a Coal Powder Preparation Station

Publication date: 2016-07-08 10:29:00 article source: admin viewed:204

1. Project Overview:

Project address: China•Shandong•Heze•Yuncheng

Construction unit: Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd.

Product name: Coal powder preparation

Main Equipment: ZKRM08.3 pulverizing coal vertical roller mill

Production scale: Vertical mill coal powder preparation station with an annual output of 50,000 tons

Service scope: From raw material storage and transportation, preheating, drying, screening, to finished product storage and transportation system, environmental dust collection system, process design of electrical automation control system, plant planning, equipment supply, equipment installation and commissioning, after-sales training, etc.one-stop technical service.

 

2. Project Description

Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. is the only large-scale printing and dyeing enterprise in Yuncheng County that mainly specializes in the printing and dyeing of pure cotton textiles. It has been a well-known production, import and export enterprise in the printing and dyeing industry throughout the country for many years. In the whole domestic printing and dyeing industry and many countries in Africa, it has developed a good reputation and broad market. As a leading export company in Heze City for many years, whether it has good social relations inside and outside the industry and harmonious relations between the government, it has formed a high reputation and social benefits in the society, and has a strong appeal in the printing and dyeing industry.

 

 3. Project Design Principles

(1) On the premise of meeting the requirements of production scale, the host adopts stand-alone and single-line equipment to achieve the purpose of smooth and compact production line, save land, and increase land use rate.

(2) The auxiliary equipment is based on the principles of stability, reliability and energy saving to ensure normal production, high quality, high yield and low energy consumption.

(3) Fully integrate the local natural conditions, optimize the design plan under the process and production conditions, and reduce the project cost as much as possible.

(4) Conscientiously implement relevant national environmental protection, laws, regulations and standards, strictly control environmental pollution, reduce pollutant discharge, protect and improve the environment, and realize safe and civilized production.

 

4. Project Implementation

Beginning in 2015, the Shandong Provincial Environmental Protection Department has promoted pulverized coal as a clean energy source to the whole province, and Linyi City is a pilot. Heze Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. approved the 20T pulverized coal boiler project, and related pulverized coal boilers and pulverized coal preparation stations are bidding nationwide.

 

Henan Zhengzhou Mining Machinery Co., Ltd. has a number of field cases in Shandong, including the coal preparation station of Linyi Shuangding Decoration Materials Co., Ltd., the coal preparation station of Linyi Xingyuan Thermal Power Co., Ltd., and the coal preparation station of Linyi Hongyuan Thermal Power Co., Ltd.. As the user of the pulverized coal boiler in Heze City,our company attaches great importance to this project.

 

ZKCorp’s pulverized coal station team members rushed to the site as soon as possible. For the specific layout of the on-site boiler, ZKCorp’s technicians proposed a design plan. After a week of technical exchanges and fierce competition from six suppliers, the customer finally confirmed 6tph the technical solution of the vertical mill coal preparation system, and signed a business contract with Henan Zhengzhou Mining Machinery Co., Ltd. on June 23, 2016. During the execution of the contract, the ZKCorp pulverized coal station team went to the site several times to communicate the plan and the project progress. In October 2016, the ZKRM08.3 vertical mill pulverized coal preparation station project was successfully completed and passed the acceptance at one time. Provide customers with good service, which not only saves production costs for customers, but also improves customers' production efficiency

 

   The after-sales personnel of ZKCorp have been stationed at the site for more than a month to provide training and technical clarifications to the on-site operators so that the later owners can better use the equipment.

 

The vertical mill pulverized coal preparation station of Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. has been in operation for more than a year. ZKCorp's after-sales service has been recognized, making the Henan Zhengzhou Mining Machinery Co., Ltd. brand more and more popular.


    The pulverized coal preparation station of the vertical mill has high technical content and difficult process connection. Henan Zhengzhou Mining Machinery Co., Ltd. has rich experience in design and production, which is worthy of the trust of customers!

 

5. Equipment Used

No.

Equipment   Name

Model

Qty

1

Vertical   Mill

ZKRM08.3

1Set

2

Auxiliary   Machine


1Batch

3

Dust   Collector


1Batch

4

Electrical   Instrument


1Batch

6. Scene Pictures

未标题-1.jpg

Previous:200,000 t/a Pulverized Coal Preparation Station of Shandong Dongjia Group

Next Page:Ball Mill for 20000 t/a Lithium Carbonate New Material Project of Shandong Lubei Chemical Industry

CONTACT US

Please input your inquiry in below form. We will reply you as soon as possible!

Qiaoloucaizhai industrial park, XingYang, Zheng Zhou, Henan, China

WhatsApp +8618037866379
Email zkeqpt@zkcorp.com