Home > Project Cases > Other Cases >

Anhui Tongling Xuanli Special Steel 1000000 t/a Lump Ore Drying System

Publication date: 2018-04-14 10:31:00 article source: admin viewed:190

1. Project Overview:

Project Address: China•Anhui•Tongling

Construction Unit: Tongling Xuanli Special Steel Co., Ltd.

Product Name: lump drying system

Production Scale: lump ore production line with an annual output of 1 million tons

Service Scope: from raw material storage and transportation, drying, cooling to finished product storage and transportation system, environmental dust collection system, exhaust gas dust removal, desulfurization and deodorization system, process design of electrical automation control system, plant planning, equipment supply, equipment installation and commissioning, after-sales service Training and other one-stop technical services.

3.jpg

Project Description

Tongling Xuanli Special Steel Co., Ltd. is located in Jinqiao Industrial Park, Tongling City, Anhui Province, in the economically active "Mawu Copper" economic zone on the south bank of the Yangtze River. It is a key investment attraction enterprise in Tongling City (county). The company was established on March 12, 2009, with a registered capital of 800 million yuan and a total investment of more than 4 billion yuan. It covers an area of 2500 acres and currently has more than 1,500 employees.

 

Before the pellets are cooled, evenly add the lump ore, use the waste heat to dry the moisture, and mix the pellets and lump ore into the warehouse, which completely solves a series of production problems such as feeding and screening caused by the large moisture and the powder. , And achieved good economic benefits.

 

The first-phase lump drying system has an annual output of 1 million tons. At the time of the bidding, well-known suppliers in the industry scrambled to sign up, and five peers participated in the bidding. After more than a month and 3 rounds of intense technical and commercial bid evaluation and bid negotiation, Henan Zhengzhou Mining Machinery Co.,Ltd finally won the bid in July.

 

3. Design Principles

During the execution of the contract, the seller shall fully communicate with the buyer, understand the working conditions, ensure that the process design conforms to the process plan jointly determined by the buyer and the seller, and ensure that the process design is reasonable, applicable, smooth and stable.

 

The seller shall comply with the current national mandatory standards and regulations in China when carrying out the process design. The seller's opinions can be solicited where there are objections, and it shall be completed on time and on time as agreed in the contract.

 

4. Project Implementation

After winning the bid, our engineering and technical personnel overcome a number of technical difficulties according to the technical requirements of the bidding documents, and carried out careful and detailed engineering construction drawing design, and passed the review at one time. In strict accordance with the contract requirements, the project department formulated a rigorous implementation plan, equipment manufacturing, installation, shipment, commissioning, etc., with the active cooperation and support of Party A’s project department, the project was completed on time and the commissioning was smooth.

 

During the trial production process, our after-sales service personnel have been on site for more than 2 months to deal with and eliminate on-site problems in time.

 

The positive work attitude, rigorous work style, excellent product quality, and good after-sales service have won the recognition and praise of Zheng Mine from all levels of Hanzhong Zinc Industry leaders and employees.

 

The acceptance of the project is qualified.

 

5. Equipment List

No.

Name

Model

Qty

1

Hot Stove

ZK-RFL8 Blast Furnace Gas Hot Blast   Stove

1 Set

2

Rotary Dryer

Φ3.2×22m

1 Set

3

Dust   Collector

PPC96-2×8 Pulse Dust Collector

1 Set

4

Electrical Instrument


1 Batch

 

6. Onsite Photos

1.jpg

Previous:Henan Mingtai Technology Co., Ltd. 50,000 t/a Aluminum Ash Processing Project

Next Page:200,000 t/a Pulverized Coal Preparation Station of Shandong Dongjia Group

CONTACT US

Please input your inquiry in below form. We will reply you as soon as possible!

Qiaoloucaizhai industrial park, XingYang, Zheng Zhou, Henan, China

WhatsApp +8618037866379
Email zkeqpt@zkcorp.com